Peab to lower road

29 February 2016

Peab has been commissioned to carry out a reconstruction of the E45 European route in central Gothenburg, Sweden, for the Swedish Trafikverket, with a contract amounting to approximately SEK1.02 billion (€109.40 million).

The work includes a lowering of the E45 road in central Gothenburg from Lilla Bommen to Marieholm by approximately 6m along an 800m stretch.

Half the distance will be decked over, creating opportunities for building on top of the tunnel roof. The rest of the lowered road is in preparation for future decking, according to Berth Larsson, regional manager at Peab.

The renovation includes a bridge at Gullbergsmotet widened to create two through lanes on the E45.

Construction will start this spring and the project is expected to be completed in 2020.

Peab has offices in Sweden, Norway and Finland.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA