New bridge

27 February 2008

The M0 north danube-bridge consortium – poland's Hídépítö and germany's strabag – has used Peri ACS self climbing formwork, Vario girder formwork, Domino panel formwork and Multiflex girder wall formwork, during construction of the 1862 m long Megyeri Bridge in Budapest, Hungary.

When complete in August 2008 the HUF 61,9 billion (€ 247 million) bridge, part of the northern section of the MO motorway – the ring road around the capital – will connect to the m3 motorway. Divided into five sections on a total of 28 supports, the central part is a 590 m long cable-stayed bridge over the River Danube with spans of 145, 300 and 145 m respectively. Construction includes two abutments, four joint supports, seven floodplain piers and the two A-shaped pylons in the centre of the river.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA