Video: Ferrovial’s heavyweight bridge manoeuvre

By Mike Hayes04 May 2021

Spanish construction giant rolls 2,200 tonne bridge into position over busy motorway

Ferrovial prepares to roll the Concordia Bridge into position in Madrid

Ferrovial recently completed the positioning of a bridge span in Madrid, by simply rolling the 2,200 tonne structure into position.

The video below shows how the Spanish contractor manoeuvred the 162m span from the side of the busy M-12 motorway, using self-propelled modular trailers (SPMTs).

The bridge has a deck width of 24.5m to accommodate two lanes of traffic in both directions, plus sidewalks.

The deck is constructed from 3m sections of steel, covered by a 0.25m-thick layer of concrete slab.

The bridge is balanced at each end with a counterweight, which is anchored to the ground with stakes under traction.

When open, the Concordia Bridge will create a direct connection between the Valdebebas area of Madrid and terminal 4 of the nearby Barajas Airport.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Construction Europe Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
More News from Construction Europe
Skanska raises the climate bar
Swedish construction giant now targeting 70% carbon emissions reduction by 2030
Peri launches digital concrete monitoring kit
Temperature Monitoring and Concrete Maturity Kit takes temperature readings from different points in concrete
ISG starts construction of ‘UK’s first gigaplant’
Britishvolt manufacturing facility in Northumberland will produce 300,000 low-carbon battery cells for automotive sector
CONNECT WITH THE TEAM
Mike Hayes Editor, Construction Europe Tel: +44 (0)1892 786 231 E-mail: mike.hayes@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA