Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen

By Steve Ducker22 July 2021

The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.

The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).

To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Construction Europe Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
More News from Construction Europe
Skanska raises the climate bar
Swedish construction giant now targeting 70% carbon emissions reduction by 2030
Peri launches digital concrete monitoring kit
Temperature Monitoring and Concrete Maturity Kit takes temperature readings from different points in concrete
ISG starts construction of ‘UK’s first gigaplant’
Britishvolt manufacturing facility in Northumberland will produce 300,000 low-carbon battery cells for automotive sector
CONNECT WITH THE TEAM
Mike Hayes Editor, Construction Europe Tel: +44 (0)1892 786 231 E-mail: mike.hayes@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA