Rubble Master Forestry Tracks

04 March 2009

RM100 ensures mobility and performance in building forestry tracks Rubble Master’s 28 tonne RM 100 was used to prepare about 15000 tonnes of gneiss-type rock for construction of 20 km of forestry track, 1500 m above sea level in the forests of the Lavant Valley by Austria’s Kostmann.
STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA