London City Airport project

26 September 2018

 

A new video from London City Airport, UK, illustrates the scale of the engineering project now underway in King George V Dock, as the £480 million (€538.5 million) City Airport Development Programme gathers pace.

Peter Adams, London City Airport’s chief development officer, introduces the two-year piling and decking phase alongside Dave Bolger, a section engineer from BAM Nuttall.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA