Vinci subsidiary awarded onshore gas pipelines contract

14 March 2016

Spiecapag, a subsidiary of Vinci, has been awarded the contract for three lots of onshore gas pipelines as part of the Trans-Adriatic Pipeline (TAP) project.

One lot, between Kipoi and Kavala, in Greece, is 185km, while the other two lots, between Bilisht and Topoje, in Albania, total 215km.

The TAP will connect to the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, and will cross Greece, Albania and the Adriatic Sea connecting to the Italian gas network. Once completed, the TAP project will transport gas from the Shah Deniz II gas field in Azerbaijan into Europe.

Jean-Claude Van de Wiele, managing director of Spiecapag, said, "We have begun mobilisation of our teams to allow work to start in mid-2016.”

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA