Digital positioning speeds up hospital build

By Leila Steed19 January 2021

Groundworks engineering specialist Züblin Spezialtiefbau has used a Liebherr LB28 drilling rig equipped with the equipment manufacturer’s LIPOS positioning system for the first time, to complete piling works to a new hospital in Oberwart, Austria.

The Germany-based company, which has been operating across Europe for over 100 years, installed a total of 1,310 piles for the Burgenland Hospital Association’s (KRAGE’s) new 23,000m² medical building. Upon completion it will provide medical, nursing and therapeutic care to the region.

Please login to continue reading!

Once you login you will receive unlimited access to Construction-Europe.com

  • FREE high value digital reports
  • Presentations from KHL events
  • Videos and magazine archive
  • Subscribe to magazines
  • Register for e-newsletters
  • Webinar recordings

Don’t miss out on the latest information!

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Construction Europe Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
More News from Construction Europe
Infrastructure spending expected to rise in Eastern Europe
GlobalData report suggests just four out of 15 countries can speed up infrastructure projects to boost post-pandemic growth
Honda and Komatsu team up for electric mini excavator
Partnership aims to allow Honda’s MPP batteries to be used with various Komatsu equipment
SBM seals huge concrete deal on Fehmarnbelt Link
Austrian firm’s plants will produce 3 million m3 of concrete for world’s longest immersed tunnel
CONNECT WITH THE TEAM
Mike Hayes Editor, Construction Europe Tel: +44(0) 1892 786 231 E-mail: mike.hayes@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA